CONCULUDED WATER DRILLING WORKS
Ergani Municipality:
Our firm, which won urgent drinking water providing adjudication that
was adjucated by Ergani Municipalty in 1999, which consisted of payment
depend on provided water amount and end of this work, drilled 650
meters waterwell and provided 75 liters water. As a result 75 liters
water was added to the depot of Ergani Municipalty and realized %75
of target amount. So water shortage of Ergani Municipalty was ceased
on a large amount.
Silvan Municipality : In the
year 2000, our firm won the drinking water adjudication, which was
adjucated by Silvan Municipalty. Between Silvan Mýnicipalty
and our firm an agreement was signed. The peyment of which was on
condition of the provided water amount like in Ergani Municipalty.
In the North of Silvan town, 7 wells were drilled by our firm. From
these wells approximately 400 liters water was provided. With this
amount, target amount was increased %300. With this amount, water
shortge in Silvan town in Summers, ended.
Habur Customs Gate: In Habur
Customs Gate, in 1999, a waterwell of, 120 meters depth, was drilled
by our firm. Besides, the Submersible pomp and its equipments were
provided by our firm. With this well, Customs Gate lack of water issue
was solved.
The Highway X Region Directorate: In
1999, our firm, which won 450 meters depth water well drilling work,
which adjudicated by Higway IX Region Directorate, drilled a water
well with 454 meters depth in this place.
Tepe Substructure:In order
to supply water need of Ýdil2 Mobil Power House that belongs
to Tepe Substructure in the town Ýdil province Þýrnak,
400 meters depth water drilling well work was done and need of water
supply was provided.
ONKA Corparation:
The work of water drilling well with
400 meters depth was done for the concreate pipe plant which belengs
toONKA A.S. which undertook the sonstruction of Collector Lines Work
from the Diyarbakir Greater Municipality.
Toprak Marble: The
work of drilling Two Water Wells with 100 meters depth each and
providing the pomping equipments for the marble mine and the Lice
Marble Plant which belongs to Toprak Marble was done.
Fernas Constructiont:
Drilling one water well work with 150 meters depth in the ares of
Mobil Powerhouse whid belngs to Fernas Insaat, in the province of
Batman was done.
Privote Wellsr:For the
regional formers of Diyarbakir, living arround Bismil and Chinar
towns a lof of water drilling wells were drilled with app.400-450
meters depth by our company. From the time that our company had been
establisihed up to now on a cumilative depth measurement of app.10000
meters for water drilling wells has been finalized with success.
FAUNDATION DRILLING WORK
Silvan Dam:
In 2000 year, our firm finalized Silvan dam and Irrigation Tunels
foundation Core boring Work, which was adjudicated by State Water
Work. In scope of this work 1678 meters core borings was drilled
in the same year. In all bores, pressure water test was done piezometer
pipes were settled.
Tepe Walter
Bau Joint Venture: By request of Tepe Walter Bau
Joint Venture, which undertook the Construction of Diyarbakir
Collector Line and Filtering Station, the geological analysis of
the area was made and reports (both in English and Turkish) were
made by the experienced engineers of our company. Withinthis work
a approximately 400 meters founding drilling boreholes was drilled.
TRT Diyarbakir Region:
The problem about leakage of the two water drilling wells belong to
the Chinar Radio Bloadcasting Station of TRT Diyarbakir
Region administration was solved via injection. To avoid leeking that
would probably take place between the pipe of the artesion well and
the ground, six foundation boreholes were drilled systematically around
the well and via cement injection leakage was prevented.
ABS Plaster Industryi: In accorddance with the demand
of ABS Plaster Industry app. 600 meters of foundation boreholes, in
order to calculate the plaster reserve of the surroundigs the vicinity
of Danali of the town of Beshiri of the city of Batman were drilled.
The Plankotes of the drilling wells, their depth photograps and logs
together with the reserve calculations were reported and presented
to ABS plaster Industry.
AKSA Enerji A.Ş:
Foundation boreholes were drilled by our company in order to prepare
soil investigation report of the mobil cantrals of Idil2, Hakkari,
Siirt, Kiziltepe centrals, which are belong to Aksa Enerji A.C and
the related reports were given to Aksa A.C under the confirmation
of Emergency Administcation.
Gama Container A.C:
The ground reserch for the issve of removation and enlemgthering of
the chimney of Batman Refinery undertaken by Gama Conntainer A.C in
accordange with the demand of the very sume company was made by vs.
Onka A.C:
The issue of excavation analysis of some points of the canalization
construction held by Tepe Walter Bau Joint Venture which is undertaken
by the the contractantOnka A.C and the analysis of the effects
of this on the superstructure (as a means of landslide) were reported.
Golalan Marble:For
searching marble reserve, boreholes of 200 m approximately total depth
were drilled in a field that belongs to Golalan Marble.
Manucipality of Diyarbakir New Bus Terminal:The
soil investigation of new terminal, the construction of which held
by Bimax Com was made by our firm.
Diyarbakir New Wheat Market:
The soil investigation of the market place and the foundation boreholes
were drilled by our company.
Diyarbakir N.V Turkse Perenco Establishment: Geologial
and geo-technical reports of the establishement were made by our company.
|