YERSU ENGINEERING Nav Button 2 Nav Button 2 TÜRKÇE
        Home Page        Scopes         Company Profile         Technical Reports         Services         Contact Us


YERSU ENGINEERING




SCOPES

  • To drill hotwater, drinking water and irrigation wells which is of everykind of diameter and to the extent of 600 meters,
  • Every kind of construction works,
  • Every kind of restoration works,
  • Every kind of advisory works,
  • Building supervision works,
  • To drill core boring with every kind of diameter and depth,
  • Soil investigation Reports of constructions,
  • Injection and field survey works of every kind of constructions like dams and artifical lakes, etc.
  • To drill of every kind tunnels,
  • To design and execute every kind of anchorage works,
  • To prepare projects of well drilling and well register. ( searching and using certificate)
  • To design project of constructions like dam, lake etc, production and practice energy.
  • Distrubition of Şahinler Submersible Pumps.
  • Distrubition of Göktepe-Erdem Plastic pipe and plastic products.
  • Distrubition of Domak submersible and surface pums.
  • Distrubitor of UKE steel pipes.

    CONCULUDED WATER DRILLING WORKS

  • Ergani Municipality: Our firm, which won urgent drinking water providing adjudication that was adjucated by Ergani Municipalty in 1999, which consisted of payment depend on provided water amount and end of this work, drilled 650 meters waterwell and provided 75 liters water. As a result 75 liters water was added to the depot of Ergani Municipalty and realized %75 of target amount. So water shortage of Ergani Municipalty was ceased on a large amount.
  • Silvan Municipality: In the year 2000, our firm won the drinking water adjudication, which was adjucated by Silvan Municipalty. Between Silvan Mınicipalty and our firm an agreement was signed. The peyment of which was on condition of the provided water amount like in Ergani Municipalty. In the North of Silvan town, 7 wells were drilled by our firm. From these wells approximately 400 liters water was provided. With this amount, target amount was increased %300. With this amount, water shortge in Silvan town in Summers, ended..
  • Habur Customs Gate: In Habur Customs Gate, in 1999, a waterwell of, 120 meters depth, was drilled by our firm. Besides, the Submersible pomp and its equipments were provided by our firm. With this well, Customs Gate lack of water issue was solved.
  • The Highway X Region Directorate: In 1999, our firm, which won 450 meters depth water well drilling work, which adjudicated by Higway IX Region Directorate, drilled a water well with 454 meters depth in this place.
  • Tepe Substructure: In order to supply water need of İdil2 Mobil Power House that belongs to Tepe Substructure in the town İdil province Şırnak, 400 meters depth water drilling well work was done and need of water supply was provided
  • ÖNKA Corparation: The work of water drilling well with 400 meters depth was done for the concreate pipe plant which belengs to ÖNKA A.Ş. which undertook the sonstruction of Collector Lines Work from the Diyarbakır Greater Municipality.
  • Toprak Marble: The work of drilling Two Water Wells with 100 meters depth each and providing the pomping equipments for the marble mine and the Lice Marble Plant which belongs to Toprak Marble was done.
  • Fernas Construction: Drilling one water well work with 150 meters depth in the ares of Mobil Powerhouse whid belngs to Fernas İnşaat, in the province of Batman was done.
  • Privote Wells: For the regional formers of Diyarbakır, living arround Bismil and Çınar towns a lof of water drilling wells were drilled with app.400-450 meters depth by our company. From the time that our company had been establisihed up to now on a cumilative depth measurement of app.10000 meters for water drilling wells has been finalized with success.

    FAUNDATİON DRİLLİNG WORK

  • Silvan Dam: In 2000 year, our firm finalized Silvan dam and Irrigation Tunels foundation Core boring Work, which was adjudicated by State Water Work. In scope of this work 1678 meters core borings was drilled in the same year. In all bores, pressure water test was done piezometer pipes were settled.
  • Tepe Walter Bau Joint Venture: By request of Tepe Walter Bau Joint Venture, which undertook the Construction of Diyarbakır Collector Line and Filtering Station, the geological analysis of the area was made and reports (both in English and Turkish) were made by the experienced engineers of our company. Withinthis work a approximately 400 meters founding drilling boreholes was drilled.
  • TRT Diyarbakır Region: The problem about leakage of the two water drilling wells belong to the Çınar Radio Bloadcasting Station of TRT Diyarbakır Region administration was solved via injection. To avoid leeking that would probably take place between the pipe of the artesion well and the ground, six foundation boreholes were drilled systematically around the well and via cement injection leakage was prevented.
  • ABS Plaster Industry: In accorddance with the demand of ABS Plaster İndustry app. 600 meters of foundation boreholes, in order to calculate the plaster reserve of the surroundigs the vicinity of Danalı of the town of Beşiri of the city of Batman were drilled. The Plankotes of the drilling wells, their depth photograps and logs together with the reserve calculations were reported and presented to ABS plaster Industry.
  • Aksa Enerji A.C: Foundation boreholes were drilled by our company in order to prepare soil investigation report of the mobil cantrals of İdil2, Hakkari, Siirt, Kızıltepe centrals, which are belong to Aksa Enerji A.C and the related reports were given to Aksa A.C under the confirmation of Emergency Administcation.
  • Gama Container A.C:The ground reserch for the issve of removation and enlemgthering of the chimney of Batman Refinery undertaken by Gama Conntainer A.C in accordange with the demand of the very sume company was made by vs.
  • Önka A.C: The issue of excavation analysis of some points of the canalization construction held by Tepe Walter Bau Joint Venture which is undertaken by the the contractant Önka A.C and the analysis of the effects of this on the superstructure (as a means of landslide) were reported.
  • Gölalan Marble: For searching marble reserve, boreholes of 200 m approximately total depth were drilled in a field that belongs to Gölalan Marble
  • Manucipality of Diyarbakır New Bus Terminal: The soil investigation of new terminal, the construction of which held by Bimax Com was made by our firm.
  • Diyarbakır New Wheat Market: The soil investigation of the market place and the foundation boreholes were drilled by our company.
  • Diyarbakır N.V Turkse Perenco Establishment: Geologial and geo-technical reports of the establishement were made by our company.

    ESTABLISHMENT:

    YERSU Engineering Drilling Construction Treatment Ltd. Com. was founded in Diyarbakýr, in Hindibaba 1st street Deniz Ap. No: 1. Our company has been going on it's activity since estabilishment.

    STAFF:

    2 Geology Engineer
    2 Mining Engineer
    1 Construction Engineer
    1 Electricity Tecnicihen
    4 water and foundation fathometers work for our company.

    The Curriculum Vitae of Mehmet Mahfuz Tutþi, who is the manager of our company and some of his works:

    He was born in 1941 in the town of Silvan in Diyarbakýr. He complated higschool in Diyarbakýr.
    He graduated from Ýstanbul Universty Faculty of science Department of Geology Engineering in 1968. He started to work as a geology engnineer in (SWW. X. Regional Directorate) Fýrat Planning Administration. He continued this task till October 1972, He completed his military service between October 1972 March 1974 as an officer. He restarted work as a geology engineer in X. Regional Directorate of SWW.
    After having completed his masters degree in 1978 in Ýstanbul Universty.he was entitled as chief engineer of geology.
    He became a chief engineer head in 1979, branch director in 1981, assistance director of regional directorate in 1985. He got retired in 11 January 1999

    He had served for 32 years for planning projecting, final planning and consturuction of almost all of projects within GAP (South-eastern anotolia Project)

    Some of Hýs Essays and Declecations:

    1. Fýrat Planning Administration And Atatürk Dam From Notions To Practice
    2. Atatürk Dam, DSÝ 40th. Year, 1944 ANKARA
    3. Batman Dam, The Properties Of Evaporite Germic Formation And Their Effection Dam Construction Engineering Geology Seminer 1978 Bursa,Yalova
    4. The Irrigation Of The Right Shore Of Tigris Was Undertaken, DSÝ Bulletin 1985, ANKARA
    5. Diyarbakýr Drinking Water Project Source Alternatives DSÝ Bulletin.

    The Curriculum Vitae of Adem Esen, who is a shareholder of our company, and some of his Works:

    He was born in Diyarbakýr in 1971, after primary education, attended the technical highschool of Diyarbakýr Machinery Department. After having graduated from this school in 1988 he started Çukurova.University Faculty of Engineering Geology Engineering Department and graduated in 1992.1992-1994 he worked in Dicle Dam HEC establishment injection works as a shift engineer. Between the years 1995-1997 he worked in Özlüce Dam HEC establisment as a Office engineer and field engineer. Between 1997-1999 he worked in Çanakkale Umurbey Dam establishment injection works as site chief and in Muðla Milas. In Akgedik Dam, injection and sounding works as a building site chief.
    Since 1999 he has been a shareholder of Yersu Company.

    MACHINE PARK

  • Two water drilling machine, each has 600 meters depth capacity and its equipments,
  • Two foundation drilling machines with 300 meters depth capacity assembled to the Dodge truck and its equipments